Lots more work happening out at the Greenhouse. The work days have been extremely helpful, and I hope to have more soon. The heat out there is pretty bad, though, especially since I can't roll up both sides of my greenhouses. I'm working on getting that fixed. I may need to switch to a night schedule, so I can work in the cool.
Once the building is done, I don't think it'll be a problem.
|
Sump pit almost complete. Using a 5gal bucket as a step in and out. |
|
|
Using cable ties to attach the insulation and plywood to the IBC frame. | | | | | |
|
|
Sumptank in place! |
|
|
Laying out the troughs. |
|
omg this is all so exciting!
ReplyDelete